Our ZA bridge division built and installed a steel frame Bent replacing the existing timber Bent. We also did a pier restoration on the supporting structure.
We are removing drift and debris in a main river channel with the assistance of our river barges, river boat, and our komatsu excavator.
Our ZA team came together to install a new timber deck including ties and walkway during a unfortunate bridge fire. This team installed the 350′ deck system in only 48 hours.